Alliance Nefte Khim (ANKH)
ErichHahn works enterprise reconstruction, equipment supply:
– Loading/unloading: ATU, ATL
– Tanks: MT, ST, HT
– Pumping and heating equipment (FN, HPDU, OPS)
At the moment, the first stage of reconstruction has been completed – the completion date of the 1st stage is mid-2023. Two more stages are planned, including a separate railway line.
Terminal Datas
Terminal Area: 6 ha
Storage Capacity: 20 thousand tons
Reception: motor transport up to 1,500 tons per day
Shipping: motor transport up to 2,000 tons per day
Production: up to 200 tons per day – PBB, PMB
Up to 60 tons per day – emulsions
Packaging up to 200 tons per day.