Location: Russia, Altai Krai, Biysk

Altai Bitumen Terminal

ErichHahn works: supply and installation of equipment for an automated bitumen terminal. Supplied equipment: ARU, ATLU, pumping and transfer equipment.

Terminal Datas

Start of Construction: End of 2019
Officially Launched: August 24, 2024
Terminal Area: 7.2 hectares
Storage Capacity: 20 thousand tons
A project for two new tanks of 9.5 thousand tons each is being developed.
Reception: 90,000 tons per year – railway tanks
150,000 tons per year – road transport
Production: up to 50,000 tons per year – PBB, PMB
+ production of emulsions, mastics, sealants.
In 2023, more than 60 thousand tons of bitumen materials were accepted for storage and shipped.