
Ural Bitumen Terminal (UBT)
ErichHahn Works: construction of the first automated bitumen plant-terminal in Russia (design, construction, equipment supply, automation, reconstruction)
Construction Period: 3 years
Construction in 4 stages
Terminal Datas
Terminal Area: 8.3 ha
Storage Capacity: 50 thousand tons (with the possibility of expansion to 100 thousand tons)
Reception: road transport up to 80 bitumen trucks per day
railway – 16 tanks
Total 3,000 tons / day
Shipping: road transport up to 2,000 tons per day (80 bitumen trucks)
Production: up to 500 tons per day – PBB, PMB
Up to 500 tons / day – emulsions
+ mastics, road tapes
After commissioning, The terminal was acquired by PJSC LUKOIL.