Location: Russia, St. Petersburg

Turukhtan Islands Terminal

A full automation of technological processes is being carried out at the fuel terminal.

Terminal Datas

Site area: 7.34 HA
Construction period: 3 years
Stage 1 completed works: design; construction; installation of engineering systems; equipment installation.
Stage 2 design works: equipment installation.

Production capacity (cargo turnover):
Bitumen – 850 thousand tons/year
M-100 Fuel Oil – 1,400 thousand tons/year
M-40 Fuel Oil – 504 thousand tons/year
Diesel fuel – 300 thousand tons/year
PMB – 50 thousand tons/year

Menu