Turukhtan Islands Terminal
A full automation of technological processes is being carried out at the fuel terminal.
Terminal Datas
Site area: 7.34 HA
Construction period: 3 years
Stage 1 completed works: design; construction; installation of engineering systems; equipment installation.
Stage 2 design works: equipment installation.
Production capacity (cargo turnover):
Bitumen – 850 thousand tons/year
M-100 Fuel Oil – 1,400 thousand tons/year
M-40 Fuel Oil – 504 thousand tons/year
Diesel fuel – 300 thousand tons/year
PMB – 50 thousand tons/year