Bitumen modification unit for Rustav Oil
ErichHahn supplied an MB-25 bitumen modification unit to the Georgian company Rustav Oil. The equipment was manufactured at ErichHahn’s production facility and supplied as part of the bitumen terminal works, which include design, manufacturing, supply and installation.
Supply data:
Delivery date: June 2026
Unit capacity: from 25 to 35 t/h
Output products: all grades of PMB, PM and PG bitumen in accordance with EN 14023, as well as GOST R 52056 and GOST R 58400.1.
Control system: APCS (Siemens PLC + SCADA)


