The ErichHahn OBP bitumen production plant is being manufactured in 2026 for delivery to Georgia for Black Sea Petroleum.
The plant is designed to produce road bitumen from tar by oxidizing it in column and tubular type apparatuses and subsequent compounding of the overoxidized bitumen. The ErichHahn plant is engineered and assembled for continuous production of various grades of bitumen for the Customer.
Plant capacity: up to 50 t/h.
Delivery date: beginning of 2027.
The plant consists of:
- Product feed and recirculation unit (Pumping unit OBP-25-PU)
- Heat exchanger block:
- Recycle heat exchanger unit OBP-25-RHU
- Feed heat exchanger unit OBP-25-FHU
- Air preparation and supply unit (Air feed unit OBP-25-AFU):
- Compressor unit
- Air receiver unit OBP-25-AFU-AR
- Oxidation column (Oxidation column OC-17)
- Intensive oxidation unit (OBP-25-IO):
- Tubular reactors OBP-25-IO-TR
- Degasser OBP-25-IO-D
- Gas cooling and separation unit (Gas recovery unit OBP-25-GRU):
- Air cooler OBP-25-GRU-GC
- Separator OBP-25-GRU-S
- Thermal oil heating unit THU-1200 (Optional)
- Catalyst dosing unit (Additives feed unit OBP-25-AdFU)
- Automation and control unit (Control room OBP-25-CR)
- Nitrogen supply unit (nitrogen ramp) OBP-25-NR
- Oil waste unit OBP-25.01-OWU



