The BMP-3 and BMP-6 plants are designed to melt bitumen supplied in non-returnable packaging and deliver it to bitumen handling facilities. Bitumen melting and heating to the operating temperature are achieved through efficient heat transfer from the hot heat transfer fluid circulating through the plant’s heating coils to the bitumen.
Advantages of the ErichHahn BMP-3
- High bitumen melting capacity
- Equipment with a high degree of installation readiness
- Maximum ease of maintenance
- Preservation of binder quality
- Operational safety
Advantages of the ErichHahn BMP-6
- High bitumen melting capacity
- Variability of loading (upper and side)
- Preservation of binder quality
- Equipment with a high degree of installation readiness
- Maximum ease of maintenance
- Operational safety


ErichHahn BMP-3
- Frame
- Heating Unit
- Pumping Station
- Side Loading Opening
ErichHahn BMP-6
- Frame
- Access stairs
- Platform
- Upper loading system for big-bags with hoist
- Railings
- Heating Unit
- Pumping Station
- Upper loading opening
- Side loading opening
ErichHahn BMP-3
Solid bitumen blocks are loaded onto the heated supports of the BMP-3 plant using a forklift truck.
Under their own weight, packaged bitumen blocks pass through the heated supports and break into smaller pieces. The bitumen then reaches the heating coil tubes and the melting tank of the plant.
ErichHahn BMP-3
The tubular (thermal oil) heating coil consists of two circuits:
- Lower circuit.
- Side circuit.
Bitumen melting is completed in the melting tank, where the bitumen reaches the required temperature.
The BMP-3 chamber is equipped with a level sensor. Once the preset level is reached, the HPS-30 pumping station starts pumping out the heated bitumen.
Molten bitumen is pumped through the outlet nozzle into a service tank. Process waste remaining after melting is removed through the access openings.
The main advantage of the BMP-3 bitumen melting plant is the ease of maintenance. The removable heating unit allows rapid cleaning of carbon deposits from the heating coils and other plant maintenance operations.
ErichHahn BMP-6
Solid bitumen blocks are loaded onto the heated supports of the BMP-6 plant by two methods:
- Using a forklift truck.
- Using two electric hoists.
The loading system with hoists reduces the time for feeding big-bags through the upper loading openings of the plant.
Under their own weight, packaged bitumen blocks pass through the heated supports and break into smaller pieces. The bitumen then reaches the heating coil tubes and the melting tank of the plant.
ErichHahn BMP-6
The tubular (thermal oil) heating coil consists of two circuits:
- Common circuit intended for heating the entire basin of the plant.
- Individual circuit intended for heating one heating unit.
The system of valves on the oil pipelines allows each heating unit to be switched on separately.
Bitumen melting is completed in the melting tank, where the bitumen reaches the required temperature.
The BMP-6 chamber is equipped with a level sensor. Once the preset level is reached, the HPS-30 pumping station starts pumping out the heated bitumen.
Molten bitumen is pumped through the outlet nozzle into a service tank. Process waste remaining after melting is removed through the access openings.
The main advantage of the BMP-6 bitumen melting plant is the ease of maintenance. The removable design of the heating units allows rapid cleaning of carbon deposits from the heating coils and other plant maintenance operations.
Get the price
Thank you!
Your request has been sent successfully. Our specialist will contact you shortly.